Hadong Termal Power Site Divison
Maximun Generation Capacity : 4,000MW (500MW×8)
Fuel Type : Bituminous coal
Completion : May. 2009
- High efficiency standardized coal thermal power site that accounts for 3.8% of Korea’s total
domestic power generation and over 43% of KOSPO power generation

Shinincheon Combined Cycle Power Site Division
Maximum Generation Capacity : 1,800 MW (G/T 150MW×8, S/T 150MW×4)
Fuel Type : LNG
Completion : Jul. 1997
- Clean LNG combined cycle power site that supplies to concentrated power demand region
including Gyeong-in Industrial Site and Incheon International Airport

Busan Combined Cycle Power Site Division
Maximum Generation Capacity : 1,800 MW (G/T 150MW×8, S/T 150MW×4)
Fuel Type : LNG
Completion : Mar. 2004
- State-of-the-art environmental friendly LNG combined cycle power site that accounts
for over 25% of Busan’s facility capacity

Namjeju Thermal Power Site Division
Maximum Generation Capacity : 200MW (S/T 100MW×2)
Fuel Type : Bio Fuel Oil
Completion : Mar. 2007
- Core power generating site responsible for the stable power supply in Jeju,
accounting for about 20% of Jeju’s power generation

Namjeju Combined Cycle Power Site Division
Maximum Generation Capacity : 146.2MW (G/T 48.5MW×2, S/T: 49.2MW×1)
Fuel Type : LNG
Completion : Nov. 2020
- High efficient eco-friendly combined cycle power site to ensure stable power supply in Jeju region

Yeongwol Combined Cycle Power Site Division
Maximum Generation Capacity : 848MW (G/T 183MW×3, S/T: 299MW×1)
Fuel Type : LNG
Completion : Oct. 2010
- Korea’s first low carbon eco-friendly combined cycle power site transitioned from anthracite power generation

Andong Combined Cycle Power Site Division
Maximum Generation Capacity : 417MW (G/T 277MW×1, S/T 140MW×1)
Fuel Type : LNG
Completion : Jul. 2014
- LNG single-screw combined cycle power plant

Samcheok Thermal Power Site Division
Maximum Generation Capacity : 2,044MW (1,022MW×8)
Fuel Type : Bituminous coal
Completion : Jun. 2017
- World largest eco-friendly high efficiency coal thermal power site adopting the
supercritical pressure circulating fluidized bed combustion

ShingSejong Combined Cycle Power Site Division
Maximum Generation Capacity : [power]597MW(G/T: 395MW×1, S/T: 202MW×1) + [heat]340Gcal/h
Fuel Type : LNG
- Eco-friendly combined cycle power plant construction to actualize the supply of
electricity and heat with zero waste pollutant in the administrative city complex

Hanlim Power Plant
Maximum Generation Capacity : 105MW
Fuel Type : LNG
Completion : Jul. 1997
- Clean LNG combined cycle power site that plays a critical role in controlling Jeju’s power demand and supply

Hankyung Wind Power
Maximum Generation Capacity : 21MW
Operation Period : Dec. 2007 ~ Nov. 2027 (20 years)
- As KOSPO’s first Jeju wind power development site, this site contributes not only to Jeju’s effort to
create a carbon-free island but also substantially to the promotion of Jeju’s tour industry

Seongsan Wind Power
Maximum Generation Capacity : 20MW
Operation Period : Sep. 2010 ~ Aug. 2030 (20 years)
- In line with Jeju’s mid-longterm project of creating a carbon-free island, this site adopts the ESS
system to compensate for the shortfall of the wind power site